Fall 2024 WSU campus expansion and renovation update (2024)

August 15, 2024Campus ConstructionUniversity Stadiumshocker career acceleratorWichita State ConnectShocker Success CenterAthleticsWichita Biomedical CampusNIARInnovation Campus

By Strategic Communications

As the fall semester begins, you will notice ongoing and new construction across Wichita State’s 330-acres and beyond.

Read the latest update below:

Main campus:

Shocker Success Center

The Shocker Success Center opened this fall. Formerly Clinton Hall, the renovated building is a holistic resource for student services, centralizing access to these services to help students stay on course to graduate.

The center houses 18 student services previously scattered across campus in 10 buildings.

Those services are:

  • Office of Adult Learning
  • CARE Team
  • Career Closet
  • Military and Veteran Services
  • OneStop Student Services
  • Office of Student Accommodations and Testing
  • Shocker Support Locker
  • Office of Student Success
  • Office of International Education
  • Tech Help
  • TRIO Disability Services
  • TRIO Student Support Services
  • Hispanic Serving Initiatives
  • Math Lab
  • Supplemental Instruction
  • Shocker Learning Center
  • Student Outreach and Support

Jardine Hall

With OneStop Student Services moving, the Graduate School and the Office of Faculty Advancement, Retention and Excellence will move into that space in Jardine Hall.

Corbin Education Center

Corbin Education Center remains closed with repair work under way this fall to replace equipment in mechanical room damaged by a chilled water line break in March.

While the timetable for completion is uncertain, work could continue into 2025.

Ablah Library

A new stair connection point between the library and the northeast entry to the Shocker Success Center will open soon. The walkway will serve as a corridor between Ablah Library, Shocker Success Center and the Rhatigan Student Center.

Fall 2024 WSU campus expansion and renovation update (1)Paul Suellentrop

Wichita State Connect

Wichita State Connect opened in March in the former Wonder School, next to the National Institute for Aviation Research.

It will serve as a hub for preK-12 field trips, mixers and professional development opportunities for educators and to provide WSU academic colleges and programs chances to engage with schools, industry and community partners. 

McKnight Art Center north building

Ventilation upgrades for the printing studio on the second floor begin this fall and should be complete in the fall of 2025.

Parking Services

Parking Services moved to the former Credit Union building, next to University Police Department offices, last spring.

Milly Marcus Annex

The addition to the Marcus Welcome Center is open. The Shocker Career Accelerator moved to the Milly Marcus Annex in May.

The relocation is part of the Marcus Welcome Center's $5 million expansion and renovation project. The expansion introduces employer interview rooms tailored to meet students' career advancement needs.

Innovation Campus

NIAR Hub for Advanced Manufacturing Research

Construction on the NIAR HAMR building began in May. Construction is expected to be complete by the end of 2025.

The 170,000-square-foot building is partly funded by an EDA grant and will house advanced manufacturing research labs and associated offices. The building will be located on Innovation Boulevard between the Partnership Building 1 and The Suites. The first floor is primarily labs with offices on the second floor.

Partnership Building 3B

P3B, located between Partnership Building 3 and The Smart Factory @Wichita, is under construction. It will house the Forensic Crime Gun Intelligence Laboratory for the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF).

Shocker Athletics:

University Stadium (formerly Cessna Stadium)

Construction begins in October on Phase 1A at University Stadium. Phase 1A will be complete in time for the Kansas State High School Activities Association Track and Field Championship in May.

Phase 1A will include improvements on the east side of the existing track (underground utility work, seating area for approximately 5,500 on bleacher seats, free-standing field lights, fencing, ticket pavilion, restroom/storage buildings, and plaza).

Wilkins Stadium

Groundbreaking for the indoor practice facility is scheduled for 10:30 a.m. Sept. 14 at Wilkins Stadium.

It will feature a 14,400-square-foot practice facility containing a full indoor infield, batting cages and storage areas. 

In September, construction will begin on three pickleball courts between Heskett Center and Hubbard Hall to replace the courts displaced by the indoor softball facility.

Downtown:

Wichita Biomedical Campus

Construction is under way on Phase 1 of the Wichita Biomedical Campus, a $300 million, 471,000-square-foot joint health sciences center, located at the southeast corner of Broadway and William. Phase 1 is a $221 million portion of the project with a size of 350,000 square feet.

Work on foundations and underground utilities will continue throughout 2024 on the eight-story building in the heart of downtown.

The Wichita Biomedical Campus is a joint project between Wichita State and the University of Kansas. Once complete, the campus will combine WSU’s College of Health Professions programs, including its Speech-Language-Hearing Clinic, WSU Tech’s health care program and the Wichita campuses of KU School of Medicine and KU School of Pharmacy.

Construction is anticipated to be complete by the end of 2026.

Fall 2024 WSU campus expansion and renovation update (2)Helix Architecture + Design and CO Architects

Read more stories like this
Fall 2024 WSU campus expansion and renovation update (2024)

References

Top Articles
Bank of America Financial Center Services FAQs
Schönwalde-Glien - Aktuelle Nachrichten und Kommentare - MAZ
Section 4Rs Dodger Stadium
Access-A-Ride – ACCESS NYC
Limp Home Mode Maximum Derate
10 Popular Hair Growth Products Made With Dermatologist-Approved Ingredients to Shop at Amazon
Nordstrom Rack Glendale Photos
Nation Hearing Near Me
Produzione mondiale di vino
Mivf Mdcalc
Publix 147 Coral Way
Bustle Daily Horoscope
Nashville Predators Wiki
24 Hour Walmart Detroit Mi
Craigslist Edmond Oklahoma
Mani Pedi Walk Ins Near Me
Craigslist In Flagstaff
Kaitlyn Katsaros Forum
Popular Chinese Restaurant in Rome Closing After 37 Years
Sussyclassroom
Best Transmission Service Margate
Craigslist Alo
Is Holly Warlick Married To Susan Patton
The Powers Below Drop Rate
Mcclendon's Near Me
Things to do in Pearl City: Honolulu, HI Travel Guide by 10Best
Home Auctions - Real Estate Auctions
South Florida residents must earn more than $100,000 to avoid being 'rent burdened'
Los Amigos Taquería Kalona Menu
Mega Millions Lottery - Winning Numbers & Results
How to Watch the X Trilogy Starring Mia Goth in Chronological Order
Blue Beetle Movie Tickets and Showtimes Near Me | Regal
Tal 3L Zeus Replacement Lid
Giantess Feet Deviantart
Craigslist Summersville West Virginia
Raising Canes Franchise Cost
Property Skipper Bermuda
craigslist | michigan
Dr Adj Redist Cadv Prin Amex Charge
Thelemagick Library - The New Comment to Liber AL vel Legis
F9 2385
Pro-Ject’s T2 Super Phono Turntable Is a Super Performer, and It’s a Super Bargain Too
The Largest Banks - ​​How to Transfer Money With Only Card Number and CVV (2024)
התחבר/י או הירשם/הירשמי כדי לראות.
Nid Lcms
Yourcuteelena
Iupui Course Search
Dicks Mear Me
Google Flights Missoula
Lira Galore Age, Wikipedia, Height, Husband, Boyfriend, Family, Biography, Net Worth
When Is The First Cold Front In Florida 2022
Cognitive Function Test Potomac Falls
Latest Posts
Article information

Author: Terrell Hackett

Last Updated:

Views: 5543

Rating: 4.1 / 5 (72 voted)

Reviews: 95% of readers found this page helpful

Author information

Name: Terrell Hackett

Birthday: 1992-03-17

Address: Suite 453 459 Gibson Squares, East Adriane, AK 71925-5692

Phone: +21811810803470

Job: Chief Representative

Hobby: Board games, Rock climbing, Ghost hunting, Origami, Kabaddi, Mushroom hunting, Gaming

Introduction: My name is Terrell Hackett, I am a gleaming, brainy, courageous, helpful, healthy, cooperative, graceful person who loves writing and wants to share my knowledge and understanding with you.